Infrastructure contributions
Water supply, wastewater and drainage contributions are based on the provision of a base level of service to each new lot.
Standard Infrastructure Contributions (SICs) are payable when there is a subdivision that requires any combination of water, wastewater and drainage services. They are applied as follows:
- Water: 1 SIC per lot for all land use types
- Wastewater: 1 SIC per lot for all land use types
- Drainage: Only applies in the Perth Metropolitan in declared drainage areas:
- Residential: 1 SIC per lot
- Non-residential: 1 SIC + 1 SIC per 350m2 of lot area
- Schools and universities on lots LESS than 3 hectares: 1 SIC + 1 SIC per 350m2 of lot area
- Schools and universities on lots GREATER than 3 hectares: 1 SIC + 1 SIC per 350m2 of lot area up to 3 hectares and 1 SIC per 1250m2 of lot area over 3 hectares.
Infrastructure contributions are not payable on the creation of public open space and crown reserves, as there is no inherent demand for water supply or wastewater services.
The above information is a guide for calculating the level of infrastructure contribution requirements for your subdivision.
More information
For further information, please refer to the infrastructure contributions charges.
Alternatively please email land.servicing@watercorporation.com.au or call us on (08) 9420 2099.
Infrastructure contributions
One-off charges are payable when subdividing land to create extra lots that require water and sewer services.
Deferring infrastructure contributions
Payments can be deferred for up to 12 months - find out about eligibility and applicable conditions.