If you are applying to deliver reticulation works, complete this form to lodge any additional or updated documentation.

Depending on which stage of the land development process your application is in, this can include:

  • pre-design inspection
  • design standard variations
  • initial design submissions
  • amended submission enquiries
  • final design submissions
  • pre-handover checklists
  • as-constructed (as-con) plans or concept plans.

Refer to the Developers’ Manual for a comprehensive step-by-step guide of how Water Corporation reticulation assets are to be planned, designed, constructed and delivered as part of your development.

Depending on your submission type you might need to download our water pre-handover checklist and sewer pre-handover checklist.

Offline